Maximise asset performance and regulator compliance in lifting and carrying operations controlling load & full 3D machine envelope with KINSHOFER Prolec's RCi Pro HS, setting the UK standard, exceeding the requirements of LOLER
Suitable for
Benefits
Features
Options
Fully engineered for compatibility with all major manufacturers, the system maximises the machine’s productivity when lifting. Using PME500 ensures your construction equipment remains LOLER compliant, controlling load & full 3D envelope whilst enabling you to tender for work with major infrastructure projects.
PME500 is designed to ensure the safety of lifting operations and combines all functions of the Prolec control and safety range into one unit. Combining real time load and position the system will maintain a safe load and stay within a defined envelope in both the horizontal and vertical plane. The carried load is displayed graphically on a high definition, daylight viewable screen to the operator and warnings are given on approach to the maximum Safe Working Load (SWL). A graphical interface also shows the limits for slew and height and these can be set according to the operational or environmental requirements of the equipment. This system fully complies with EN and UK LOLER requirements for safe load indicators and is type approved for operation in all EU countries. The system is set up for hydraulic control on all motions and, when combined with hydraulic motion cut valves, will limit travel in any plane to the defined envelopes.
PME500 is a cost effective Rated Capacity Indicator solution controlling load and full 3D machine envelope that does not compromise on quality or safety.